|
|
| Project Name: Remodel a Basement |
| Project Location: Ooltewah, TN |
| Date: 04/30/2012 |
| Design Preparation: None |
| Basement Features: Bathroom(s) |
| Basement Features: Bedroom(s) |
| Basement Area Description: Unfinished |
| Square Footage: 400 - 800 (medium) |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: We are looking to finish our basement with bathroom, bedroom, flooring, walls, and HVAC. |
|
|
|
| Project Name: Build an Addition |
| Project Location: Ooltewah, TN |
| Date: 04/26/2012 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Addition: Second story addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Build - Use existing architectural drawings |
| Rooms Included:: Bathroom |
| Rooms Included:: Bedroom(s) |
| Rooms Included:: Garage/Workshop |
| Property Owner: Yes |
| Comment: We have a one level that we want to expand and add 2 level |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Ooltewah, TN |
| Date: 03/25/2012 |
| Shower / Bath: No - I will keep the existing shower or bath as is |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Replace tub shower walls |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Ooltewah, TN |
| Date: 03/22/2012 |
| Design Preparation: None |
| Basement Features: Separate Apartment |
| Basement Area Description: Finished |
| Square Footage: More than 800 (large) |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: basement income property |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Ooltewah, TN |
| Date: 03/12/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Project Description: Other |
|
|
|
| Project Name: Build an Addition |
| Project Location: Ooltewah, TN |
| Date: 03/10/2012 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Living/Family room |
| Property Owner: Yes |
| Comment: Add 300-400 addition on to back of house and replace deck that must be taken down for addition. There is a large white oak tree that will need to be taken down prior to addition as well. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Ooltewah, TN |
| Date: 02/08/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: remove existing shower, cabinets, tile and whirlpool. Frame a new shower, place a new corner whirlpool, new cabinets, counter tops and new tile both in the shower and on floor. Remove wallpaper and paint walls. |
|
|
|
| Project Name: Build an Addition |
| Project Location: Ooltewah, TN |
| Date: 02/08/2012 |
| Desired Completion Date: More than 2 months |
| Request Stage: Ready to Hire |
| Type of Addition: Remodel existing space |
| Project Description: Build - Use existing architectural drawings |
|
|
|
| Project Name: Remodel or Renovate One or More Rooms |
| Project Location: Ooltewah, TN |
| Date: 01/14/2012 |
| Design Preparation: None |
| Rooms to be Remodeled: Bathroom |
| Rooms to be Remodeled: Bedroom |
| Rooms to be Remodeled: Common area |
| Expected Level of Quality: Good - I want a balance between quality and price |
| Remodel Featurings: Cutting in new or larger windows or doors |
| Remodel Featurings: Walls and/or Ceilings |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: I want a room enlarged - push a wall back and a wall added. Connect bathroom to bedroom. |
|
|
|
| Project Name: Build an Addition |
| Project Location: Ooltewah, TN |
| Date: 12/21/2011 |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Project Description: Design and build |
|