|
| Project Name: Remodel a Kitchen |
| Project Location: Ogden, UT |
| Date: 05/24/2012 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
| Project Name: Remodel a Basement |
| Project Location: Ogden, UT |
| Date: 05/23/2012 |
| Basement Features: Bathroom(s) |
| Basement Features: Bedroom(s) |
| Basement Features: Home Theater |
| Basement Area Description: Partially Finished |
| Square Footage: More than 800 (large) |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: We changed the layout of the basement in the home we purchased 2 years ago. Last summer we installed a beam and took down a bearing wall. There a couple of walls that need to be built, but for the most part, it just needs to be mudded, taped, sanded, etc. This would be a great side project for someone. |
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Ogden, UT |
| Date: 05/22/2012 |
| Type of Work: Cabinets |
| Type of Work: Carpentry-finish |
| Type of Work: Countertops |
| Type of Work: Doors and windows |
| Type of Work: Drywall |
| Type of Work: Painting |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Project Description: Several small projects of varying nature |
| Project Type: Interior |
| Property Owner: Yes |
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Ogden, UT |
| Date: 05/18/2012 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: No - I do not plan to move or update the cabinets |
| Appliances: No - I do not plan to move or update the appliances |
| Countertops: No - I do not plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Ogden, UT |
| Date: 05/16/2012 |
| Shower / Bath: No - I will keep the existing shower or bath as is |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: Yes |
| Property Owner: Yes |
| Comment: need to replace the sub-floor and some drywall |
|
|
|
| Project Name: Build an Addition |
| Project Location: Ogden, UT |
| Date: 05/14/2012 |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Build an Addition |
| Project Location: Ogden, UT |
| Date: 05/08/2012 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Build - Use existing architectural drawings |
| Rooms Included:: Bathroom |
| Rooms Included:: Bedroom(s) |
| Property Owner: Yes |
| Comment: Add a bedroom and bath to existing home |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Ogden, UT |
| Date: 05/07/2012 |
| Comment: I have a bathroom that i would like to get a quote on remodel my bathroom. Its a small bathroom and im looking to get some ideas on remodeling it. |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Ogden, UT |
| Date: 05/04/2012 |
| Design Preparation: None |
| Basement Features: Bathroom(s) |
| Basement Features: Bedroom(s) |
| Basement Area Description: Partially Finished |
| Square Footage: More than 800 (large) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Comment: Install complete full bathroom with possible movement of walls. Two bedrooms currently - knock out wall between, add walk-in closet area and possibly enlarge existing windows. |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Ogden, UT |
| Date: 05/02/2012 |
| Design Preparation: Sketches of basic idea of project |
| Basement Features: Bathroom(s) |
| Basement Features: Bedroom(s) |
| Basement Features: Game Room |
| Basement Features: Home Theater |
| Basement Area Description: Unfinished |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
|