|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Oconomowoc, WI |
| Date: 04/25/2012 |
| Type of Work: Drywall |
| Type of Work: Painting |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Project Description: Several small projects of varying nature |
| Project Type: Interior |
| Property Owner: Yes |
| Comment: need rooms patched for move out condition report and painted as color matching need for each room. |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Oconomowoc, WI |
| Date: 04/20/2012 |
| Type of Work: Carpentry-finish |
| Type of Work: Drywall |
| Type of Work: Electrical |
| Type of Work: Flooring |
| Type of Work: Heating and cooling |
| Type of Work: Painting |
| Type of Work: Plumbing |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Project Description: Major home repair project |
| Project Type: Both |
| Property Owner: Yes |
| Comment: I recently have an inspection to sell my home and there are a few things that need to be fixed quickly to continue with the sale. Fix a window and a piece of dry wall, Various electrical corrections, Basement repairs, Plumbing. According to the inspection, repairs must be done by a licensed electrician etc. WINDOW: A crank style window in a bathroom doesn't work so the crank must be fixed. DRYWALL: a old style wall heater will be removed leaving a square hole that will need to be patched. ELECTRICAL: PANEL PROBLEM: 1. THE NEUTRAL WIRES ARE NOT ISOLATED FROM THE GROUND AT THE GARAGE SUB PANEL. 2. IMPROPERLY WIRED SUB PANEL AT THE GARAGE. A JUMPER WIRE IS PROVIDING POWER TO THE RIGHT MAIN HOT LUG INSIDE THE PANEL. 3. OPEN KNOCKOUTS ARE PRESENT IN THE SERVICE PANEL BOX THAT HAS BEEN CONVERTED TO A JUNCTION BOX. KNOCKOUT COVERS ARE USED TO PREVENT ACCIDENTAL CONTACT WITH THE ELECTRICAL COMPONENTS INSIDE THE PANEL BOX. 4. MISSING INTERIOR COVER FOR THE SERVICE PANEL THAT HAS BEEN CONVERTED |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Oconomowoc, WI |
| Date: 04/17/2012 |
| Type of Work: Carpentry-finish |
| Type of Work: Plumbing |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Project Description: Several small projects of varying nature |
| Project Type: Interior |
| Property Owner: Yes |
| Comment: I recently have an inspection to sell my home and there are a few things that need to be fixed quickly to continue with the sale. Fix a window and a piece of dry wall, Various electrical corrections, Basement repairs, Plumbing. According to the inspection, repairs must be done by a licensed electrician etc. WINDOW: A crank style window in a bathroom doesn't work so the crank must be fixed. DRYWALL: a old style wall heater will be removed leaving a square hole that will need to be patched. ELECTRICAL: PANEL PROBLEM: 1. THE NEUTRAL WIRES ARE NOT ISOLATED FROM THE GROUND AT THE GARAGE SUB PANEL. 2. IMPROPERLY WIRED SUB PANEL AT THE GARAGE. A JUMPER WIRE IS PROVIDING POWER TO THE RIGHT MAIN HOT LUG INSIDE THE PANEL. 3. OPEN KNOCKOUTS ARE PRESENT IN THE SERVICE PANEL BOX THAT HAS BEEN CONVERTED TO A JUNCTION BOX. KNOCKOUT COVERS ARE USED TO PREVENT ACCIDENTAL CONTACT WITH THE ELECTRICAL COMPONENTS INSIDE THE PANEL BOX. 4. MISSING INTERIOR COVER FOR THE SERVICE PANEL THAT HAS |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Oconomowoc, WI |
| Date: 04/11/2012 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Oconomowoc, WI |
| Date: 04/04/2012 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 7 - 8 weeks |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Oconomowoc, WI |
| Date: 03/20/2012 |
| Project Description: Build a new sunroom or enclosed patio or porch |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Build an Addition |
| Project Location: Oconomowoc, WI |
| Date: 03/12/2012 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Build - Use existing architectural drawings |
| Rooms Included:: Bathroom |
| Rooms Included:: Garage/Workshop |
| Rooms Included:: Kitchen |
| Rooms Included:: Laundry/Mud room |
| Property Owner: Yes |
| Comment: add on to garage and make part of garage into storage and bigger kitchen and laundry room. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Oconomowoc, WI |
| Date: 03/10/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: would like shower area tiled |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Oconomowoc, WI |
| Date: 02/12/2012 |
| Design Preparation: None |
| Basement Features: Bathroom(s) |
| Basement Features: Kitchen |
| Basement Features: Storage |
| Basement Features: Home Theater |
| Basement Area Description: Unfinished |
| Square Footage: 400 - 800 (medium) |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Build an Addition |
| Project Location: Oconomowoc, WI |
| Date: 01/25/2012 |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Second story addition |
| Project Description: Design and build |
| Comment: turn garage entry in new direction and build room on top of garage, connecting to existing home. |
|