|
|
| Project Name: Remodel a Bathroom |
| Project Location: Nolensville, TN |
| Date: 11/23/2011 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Nolensville, TN |
| Date: 09/14/2011 |
| Type of Work: Doors and windows |
| Type of Work: Other |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Project Description: Other |
| Project Type: Both |
| Comment: I have a leak coming from the top of my window into my home. Not sure if it's originating from behind the brick exterior wall. |
|
|
|
| Project Name: Remodel or Renovate One or More Rooms |
| Project Location: Nolensville, TN |
| Date: 09/09/2011 |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: I would like quotes on either an addition or a total renovation of the existing house |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Nolensville, TN |
| Date: 09/08/2011 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: We have an older ranch home & would like to completely remodel our bathroom. |
|
|
|
| Project Name: Build an Addition |
| Project Location: Nolensville, TN |
| Date: 08/28/2011 |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Project Description: Design and build |
| Property Owner: Yes |
| Comment: Adding a walk-in closet to the back corner of the house |
|
|
|
| Project Name: Install or Replace Ductwork |
| Project Location: Nolensville, TN |
| Date: 06/18/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Estimate - need to install kitchen vent duct 3.25x10 for 5 feet to outside the wall with wall cap. cooktop unit there, |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Nolensville, TN |
| Date: 06/15/2011 |
| Project Description: Build a new sunroom or enclosed patio or porch |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: We would like our existing cedar deck at the rear of our home on the 2nd story converted to a nice screened covered porch with potentially stacked stone arched supports. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Nolensville, TN |
| Date: 06/05/2011 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: need shower inset installed and toilets set asap Also need vanitys set and faucets installed. Work should only take a day. Need work done this week. |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Nolensville, TN |
| Date: 04/04/2011 |
| Type of Work: Countertops |
| Type of Work: Tile |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Project Description: Other |
| Project Type: Interior |
| Property Owner: Yes |
| Comment: Looking to remodel & update a master bath. Would like to put granite counter tops in, updated fixtures, and potentially update/remodel the small standalone shower with tile? <br /> <br />Bathroom consists of a standalone shower, 2 separate sink areas, one with a small step down flat countertop area, and a corner tub. The toilet is in a "room" by itself. I don't think it's possible to change the layout of the bathroom. Just looking to update what's currently in place. |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Nolensville, TN |
| Date: 03/11/2011 |
| Design Preparation: None |
| Basement Features: Bedroom(s) |
| Basement Area Description: Unfinished |
| Square Footage: Less than 400 (small) |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|