|
|
| Project Name: Install or Replace a Bathtub |
| Project Location: Neptune Beach, FL |
| Date: 05/02/2012 |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: The bath tub is an old deep whirlpool type and is raised up a step with ceramic tyle covering the floor and step. I would like a claw foot tub to replace current tub and would like new tile on floor. |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Neptune Beach, FL |
| Date: 04/10/2012 |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Comment: Entire kitchen remodel. Scope of work would include demo of flooring and cabinets and small wall demo. tile floor demo would include adjacent dining room, foyer and hallway. Kitchen will have island, new appliances, countertops, flooring, can lighting, and cabinets. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Neptune Beach, FL |
| Date: 04/01/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Comment: 2 very small bathrooms...need new tubs/fixtures, new floors. |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Neptune Beach, FL |
| Date: 03/18/2012 |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: replace everything raise ceiling and new lighting |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Neptune Beach, FL |
| Date: 01/23/2012 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 9 - 12 weeks |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Neptune Beach, FL |
| Date: 11/29/2011 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 7 - 8 weeks |
|
|
|
| Project Name: Build an Addition |
| Project Location: Neptune Beach, FL |
| Date: 11/16/2011 |
| Design Preparation: None |
| Rooms for Addition: Master suite |
| Financing Requested: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
|
|
|
| Project Name: Build an Addition |
| Project Location: Neptune Beach, FL |
| Date: 10/27/2011 |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Detached addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Bathroom |
| Rooms Included:: Bedroom(s) |
| Rooms Included:: Laundry/Mud room |
| Rooms Included:: Living/Family room |
| Rooms Included:: Office(s) |
| Property Owner: Yes |
| Comment: Want to build a guest house/ mother-in-law suite. Spoke with city and know where i can put an addition. Need quote and ideas on structure and tie ins (electrical/water/roof breezeway) |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Neptune Beach, FL |
| Date: 07/06/2011 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: I am not sure what I want to do. I am afraid to take a shower in my current shower and would consider doing other things if they are not "too" expensive. |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Neptune Beach, FL |
| Date: 06/01/2011 |
| Type of Work: Cabinets |
| Type of Work: Carpentry-finish |
| Type of Work: Countertops |
| Type of Work: Doors and windows |
| Type of Work: Drywall |
| Type of Work: Flooring |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Project Description: Major remodel |
| Project Type: Interior |
| Property Owner: Yes |
| Comment: We have an older home and are looking to update it. The kitchen needs to be expanded (wall removal) and cabinets moved. Our family room needs to be turned into a bedroom with a bathroom and closets or our bedroom wall needs to be n=knocked down to expand our current bedroom. My husband is also thinking of adding a second floor to the house. We would like to get extimates for these jobs so we can decide which we would like to do and which is more cost effective or even possible. |
|