|
|
| Project Name: Build an Addition |
| Project Location: Mount Olive, AL |
| Date: 03/29/2012 |
| Interested in Green Alternatives: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Living/Family room |
| Rooms Included:: Office(s) |
| Property Owner: Yes |
| Comment: Add family room and office to existing 3/2 dwelling |
|
|
|
| Project Name: Remodel or Renovate One or More Rooms |
| Project Location: Mount Olive, AL |
| Date: 01/04/2012 |
| Design Preparation: None |
| Rooms to be Remodeled: Bathroom |
| Rooms to be Remodeled: Dining room |
| Rooms to be Remodeled: Kitchen |
| Rooms to be Remodeled: Laundry room |
| Expected Level of Quality: High End - I prefer the highest quality craftsmanship and materials |
| Remodel Featurings: Cabinetry |
| Remodel Featurings: Countertops |
| Remodel Featurings: Electrical |
| Remodel Featurings: Flooring and/or Carpet |
| Remodel Featurings: Heating / Air / Ventilation |
| Remodel Featurings: Plumbing |
| Remodel Featurings: Roofing |
| Remodel Featurings: Walls and/or Ceilings |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: add dining room, remodel kitchen, existing bath and laundry room |
|
|
|
| Project Name: Build an Addition |
| Project Location: Mount Olive, AL |
| Date: 10/31/2011 |
| Comment: need an estimate on bathroom renovation, and also building an addition to home |
|
|
|
| Project Name: Remodel or Renovate One or More Rooms |
| Project Location: Mount Olive, AL |
| Date: 08/17/2011 |
| Design Preparation: None |
| Rooms to be Remodeled: Bathroom |
| Rooms to be Remodeled: Bedroom |
| Rooms to be Remodeled: Dining room |
| Rooms to be Remodeled: Family room |
| Rooms to be Remodeled: Kitchen |
| Rooms to be Remodeled: Living room |
| Expected Level of Quality: Good - I want a balance between quality and price |
| Remodel Featurings: Don't Know |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: lake home at lake martin in dadeville, al. remodel the entire house. |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Mount Olive, AL |
| Date: 04/02/2011 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Mount Olive, AL |
| Date: 03/08/2011 |
| Shower / Bath: No - I will keep the existing shower or bath as is |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Replace vinyl with tile floor.Install vanity and top.(already purchased}. New base trim. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Mount Olive, AL |
| Date: 03/05/2011 |
| Shower / Bath: No - I will keep the existing shower or bath as is |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: replace vinyl flooring with tile. Change out vanity cabinet and top.(Already purchased).Replace base trim. |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Mount Olive, AL |
| Date: 02/17/2011 |
| Comment: i need a quote on widen a double door in my basement to install garage door... i do have concrete work on out side of home...pour a patio going into the garage door area... ( need someone to come out to survey the job ) the basement is very large.....1/2 is live in area.... i also have a deck to extend..... i also need some advise on building a small addditon to this basement area.... home.. i am the home owner... |
|
|
|
| Project Name: Build an Addition |
| Project Location: Mount Olive, AL |
| Date: 01/31/2011 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Remodel existing space |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Build - Use existing architectural drawings |
| Rooms Included:: Bathroom |
| Property Owner: Yes |
| Comment: My house is five years old and I had plumbing installed in basement for addition of bathroom. Walls are sheetrocked already. I need shower, sink, toilet, vent fan, lighting, flooring and door installed. |
|
|
|
| Project Name: Build an Addition |
| Project Location: Mount Olive, AL |
| Date: 01/16/2011 |
| Design Preparation: None |
| Rooms for Addition: Master suite |
| Financing Requested: Yes |
| Desired Completion Date: 3 - 4 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
|