|
|
| Project Name: Remodel a Kitchen |
| Project Location: Maylene, AL |
| Date: 03/29/2012 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Lighting: No - I do not plan to update the lighting |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Maylene, AL |
| Date: 03/18/2012 |
| Design Preparation: Sketches of basic idea of project |
| Basement Features: Bathroom(s) |
| Basement Features: Bedroom(s) |
| Basement Features: Game Room |
| Basement Area Description: Partially Finished |
| Square Footage: 400 - 800 (medium) |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: i need to finish out a bathroom with tile and install shower, vanity and drop ceiling. I need to finish out a den with drop ceiling and tile. I need to finish out a bedroom with drop ceiling and carpet. I have all the materials in the garage. I'm in a hurry to get it done. |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Maylene, AL |
| Date: 02/24/2012 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Maylene, AL |
| Date: 02/09/2012 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 9 - 12 weeks |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Maylene, AL |
| Date: 11/23/2011 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: No - I do not plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: All cabinets replaced and some added. If possible, add an island. Add shelves in the pantry. It may be necessary to replace floor and back splash. I would like to reused the current granite counter tops if possible. I like to recycle whenever and whatever is possible and still have a good quality renovation. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Maylene, AL |
| Date: 07/09/2011 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: remove flooring, install tile, remove tub, install shower, replace toilet and vanity. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Maylene, AL |
| Date: 06/28/2011 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Remove flooring,shower and toilet. Install tile floor, tub and new toilet. |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Maylene, AL |
| Date: 05/27/2011 |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: No - I do not plan to move or update the appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Lighting: No - I do not plan to update the lighting |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Maylene, AL |
| Date: 05/17/2011 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Owner.Residental.Non-historical. |
|
|
|
| Project Name: Remodel or Renovate One or More Rooms |
| Project Location: Maylene, AL |
| Date: 05/10/2011 |
| Design Preparation: None |
| Expected Level of Quality: High End - I prefer the highest quality craftsmanship and materials |
| Remodel Featurings: Electrical |
| Remodel Featurings: Heating / Air / Ventilation |
| Remodel Featurings: Walls and/or Ceilings |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Lightning damage. Must totally rewire home, replace ac, resheetrock, repaint, insulation, moulding, proper protection of furniture and flooring. |
|