|
|
| Project Name: Build an Addition |
| Project Location: Maumelle, AR |
| Date: 04/17/2012 |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Project Description: Design and build |
| Property Owner: Yes |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Maumelle, AR |
| Date: 03/24/2012 |
| Type of Work: Decks, fencing and/or exterior structures |
| Type of Work: Drywall |
| Type of Work: Electrical |
| Type of Work: Flooring |
| Type of Work: Other |
| Type of Work: Painting |
| Type of Work: Plumbing |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Project Description: Other |
| Project Type: Both |
| Property Owner: Yes |
| Comment: Small Bathroom renovation and possible deck addition |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Maumelle, AR |
| Date: 02/20/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: 1. We would like to remove the old jacuzzi type bathtub and replace with a large shower. 2. Need to remove the popcorn off the ceiling and repaint. 3. Need to remove existing linen cabinet. 4. Need to replace vanity, sinks and faucets and extend vanity to where old linen cabinet was. 5. Need to build new linen cabinetwhere old shower is located. 6. Possibly need to replace floor tile. 7. Replace existing toilet with newer water-saver toilet. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Maumelle, AR |
| Date: 02/17/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: 1. We would like to remove the old jacuzzi type bathtub and replace with a large shower. 2. Need to remove the popcorn off the ceiling and repaint. 3. Need to remove existing linen cabinet. 4. Need to replace vanity, sinks and faucets and extend vanity to where old linen cabinet was. 5. Need to build new linen cabinetwhere old shower is located. 6. Possibly need to replace floor tile. 7. Replace existing toilet with newer water-saver toilet. |
|
|
|
| Project Name: Build an Addition |
| Project Location: Maumelle, AR |
| Date: 02/13/2012 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Living/Family room |
| Property Owner: Yes |
| Comment: Add 10by12 addition on the back of my house |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Maumelle, AR |
| Date: 02/08/2012 |
| Project Description: Enclose existing patio or porch with roof, walls or windows |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Maumelle, AR |
| Date: 02/06/2012 |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Maumelle, AR |
| Date: 01/30/2012 |
| Type of Work: Foundations |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Project Description: Major home repair project |
| Project Type: Both |
| Property Owner: Yes |
| Comment: basement wall is bowed and cracked; garage floor is cracked |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Maumelle, AR |
| Date: 01/23/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Remodel two bath and add a bath off existing laundry room into garage. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Maumelle, AR |
| Date: 01/16/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Remove bath tub and install stand up shower paint etc. |
|