|
|
| Project Name: Build an Addition |
| Project Location: Mabelvale, AR |
| Date: 01/31/2012 |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Remodel existing space |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Build - Use existing architectural drawings |
| Rooms Included:: Garage/Workshop |
| Property Owner: Yes |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Mabelvale, AR |
| Date: 01/01/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
|
|
|
| Project Name: Build an Addition |
| Project Location: Mabelvale, AR |
| Date: 12/01/2011 |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Build - Use existing architectural drawings |
| Rooms Included:: Bedroom(s) |
| Property Owner: Yes |
| Comment: Would like to expand master bedrrom with bath and walk in closet. |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Mabelvale, AR |
| Date: 09/21/2011 |
| Type of Work: Other |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Project Description: Major home repair project |
| Project Type: Both |
| Property Owner: Yes |
| Comment: I have an ext wall behind the siding that rotted, need a sub floor replaced. Need to have some insulation replaced as well. This is my daughters home. |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Mabelvale, AR |
| Date: 06/08/2011 |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: No - I do not plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: replace counter top and lineoleim colors already picked out |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Mabelvale, AR |
| Date: 10/29/2010 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Mabelvale, AR |
| Date: 10/09/2010 |
| Project Description: Build a new sunroom or enclosed patio or porch |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: building new home, want screened in patio |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Mabelvale, AR |
| Date: 09/22/2010 |
| Type of Work: Siding |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Project Description: Several small projects of varying nature |
| Project Type: Exterior |
| Property Owner: Yes |
| Comment: Repair facia and replace damaged siding |
|
|
|
| Project Name: Build an Addition |
| Project Location: Mabelvale, AR |
| Date: 08/25/2010 |
| Interested in Green Alternatives: Yes |
| What are you looking for?: Price Quotes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Living/Family room |
| Property Owner: Yes |
| Comment: Add-On approx 15' x 12' Living Room with walk way deck. Remove existing front door and two windows and re-use, install three new widows into construction. I have a CAD plan view of the room we want. |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Mabelvale, AR |
| Date: 08/09/2010 |
| Project Description: Build a new sunroom or enclosed patio or porch |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Add a new sunroom to bac of home to add square footage and entertainment room. |
|