|
|
| Project Name: Remodel a Kitchen |
| Project Location: Ludlow, VT |
| Date: 11/18/2011 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Ludlow, VT |
| Date: 08/30/2011 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Very small bathroom needs updating |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Ludlow, VT |
| Date: 07/31/2011 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: 1980 small bathroom needs shower and vanity |
|
|
|
| Project Name: Build an Addition |
| Project Location: Ludlow, VT |
| Date: 04/01/2011 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Bathroom |
| Rooms Included:: Bedroom(s) |
| Rooms Included:: Living/Family room |
| Property Owner: Yes |
| Comment: This addition will be off the kitchen, extening 16ft for existing bath to be bigger, adding more floor space |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Ludlow, VT |
| Date: 02/07/2011 |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
|
|
|
| Project Name: Remodel or Renovate One or More Rooms |
| Project Location: Ludlow, VT |
| Date: 02/07/2011 |
| Design Preparation: Sketches and/or basic idea of project |
| Rooms to be Remodeled: Kitchen |
| Expected Level of Quality: High End - I prefer the highest quality craftsmanship and materials |
| Remodel Featurings: Cabinetry |
| Remodel Featurings: Countertops |
| Remodel Featurings: Electrical |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Remodel or Renovate One or More Rooms |
| Project Location: Ludlow, VT |
| Date: 12/29/2010 |
| Design Preparation: None |
| Rooms to be Remodeled: Bedroom |
| Rooms to be Remodeled: Kitchen |
| Rooms to be Remodeled: Living room |
| Rooms to be Remodeled: Common area |
| Expected Level of Quality: Good - I want a balance between quality and price |
| Remodel Featurings: Cabinetry |
| Remodel Featurings: Countertops |
| Remodel Featurings: Fireplace |
| Remodel Featurings: Flooring and/or Carpet |
| Remodel Featurings: Walls and/or Ceilings |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Ludlow, VT |
| Date: 06/07/2010 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Redo 2 bathrooms; 1 with a washer dryer ("stackable", but dryer is above washer on a shelf) |
|
|
|
| Project Name: Remodel a Bathroom - For Business |
| Project Location: Ludlow, VT |
| Date: 05/01/2010 |
| Consumer Owns Home: Yes |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Comment: need to remove exixting all in one enclosed shower/tub and replace with just shower with tile or stone. replace formica vanity top and toilet |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Ludlow, VT |
| Date: 04/12/2010 |
| Consumer Owns Home: Yes |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: No - I do not plan to update the lighting |
| Interested in Green Alternatives: Yes |
| Request is for Commercial Location: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Comment: Installing new cabinets/Counter tops and tile flooring. <br />I have a floor plan of the project |
|