|
|
| Project Name: Remodel a Basement |
| Project Location: Leesville, SC |
| Date: 02/11/2012 |
| Design Preparation: Sketches of basic idea of project |
| Basement Features: Bathroom(s) |
| Basement Features: Kitchen |
| Basement Features: Game Room |
| Basement Area Description: Partially Finished |
| Square Footage: 400 - 800 (medium) |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Need flooring, Cealings,and walls |
|
|
|
| Project Name: Build an Addition |
| Project Location: Leesville, SC |
| Date: 12/01/2011 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Build - Use existing architectural drawings |
| Rooms Included:: Bedroom(s) |
| Property Owner: Yes |
| Comment: 15x15 room added onto the back of the house |
|
|
|
| Project Name: Build an Addition |
| Project Location: Leesville, SC |
| Date: 12/01/2011 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Build - Use existing architectural drawings |
| Rooms Included:: Bedroom(s) |
| Property Owner: Yes |
| Comment: 15x15 addition added onto the back of the house |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Leesville, SC |
| Date: 10/24/2011 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: completely remodel the master bathroom, to include enlarging the shower. |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Leesville, SC |
| Date: 10/17/2011 |
| Type of Work: Cabinets |
| Type of Work: Carpentry-finish |
| Type of Work: Concrete |
| Type of Work: Countertops |
| Type of Work: Decks, fencing and/or exterior structures |
| Type of Work: Doors and windows |
| Type of Work: Drywall |
| Type of Work: Electrical |
| Type of Work: Flooring |
| Type of Work: Foundations |
| Type of Work: Framing |
| Type of Work: Heating and cooling |
| Type of Work: Painting |
| Type of Work: Plumbing |
| Type of Work: Roofing |
| Type of Work: Siding |
| Type of Work: Tile |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Project Description: Major remodel |
| Project Type: Exterior |
| Property Owner: Yes |
| Comment: House..in very poor shape, needs some structural changes/additions I think it was built in early 70's very rustic..needs changing. I am going to be talking to an architect for the plans and will need the contractor to do the work. |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Leesville, SC |
| Date: 09/12/2011 |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: need to bring the kitchen into the 21st century; it has an 80's look |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Leesville, SC |
| Date: 08/23/2011 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Build an Addition |
| Project Location: Leesville, SC |
| Date: 04/03/2011 |
| Interested in Green Alternatives: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Bedroom(s) |
| Property Owner: Yes |
| Comment: adding on a new bedroom with bath |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Leesville, SC |
| Date: 02/23/2011 |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Leesville, SC |
| Date: 12/29/2010 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: I would like to update and remodel my masterbath room, and update walls and floors in my kitchen. |
|