|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Land O Lakes, FL |
| Date: 05/17/2012 |
| Project Description: Enclose existing patio or porch with roof, walls or windows |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Hello: About to have the concrete poured and am requesting a quote for the bird cage. 40x15 foot. Concrete info below: Scope of Work: Option #1 Rear Concrete Patio Overall Size 40’-5”x15’-0” 1. Job Site Construction Plans 2. Pasco County Permit 3. 10’-0”x21’-0 Concrete Patio to Remain in Place 4. Remove Grass for Patio Extensions 5. From and Dig Footer for Patio 6. Concrete Pump 7. Place and Finish Concrete (Broom Finish) 8. Clean job site from concrete install Option #2 Texture and Paint 1. Texture new Patio Extension 2. Paint new Patio and Existing Paint Homeowner To Supply 1. Lot Survey (Plot Plan) 2. Water 3. Electrical 4. Job Site Access 5. HOA Approval |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Land O Lakes, FL |
| Date: 05/15/2012 |
| Project Description: Enclose existing patio or porch with roof, walls or windows |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: 1)L shaped house with two different roof peaks tying into each other2)uncovered concerete slab (monolithic w/footer) on front of house butting up to covered front porch3) concrete slab dimensions are: length = 28' east side width = 11'5" west side width = 11'10" heigth to top of roof drip edge = 99" |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Land O Lakes, FL |
| Date: 05/08/2012 |
| Project Description: Build a new sunroom or enclosed patio or porch |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Comment: Attached 28 X 14 Screened Lanai, needs slab, and pre-wired for fan/lights. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Land O Lakes, FL |
| Date: 05/03/2012 |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Land O Lakes, FL |
| Date: 04/27/2012 |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: No - I do not plan to move or update the appliances |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Lighting: No - I do not plan to update the lighting |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Land O Lakes, FL |
| Date: 04/26/2012 |
| Project Description: Enclose existing patio or porch with roof, walls or windows |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Slab and screen already in.We want to take down the aluminum screen and put a roof over the existing slab made of shingles to match the house.New wood pillars and rescreen |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Land O Lakes, FL |
| Date: 04/25/2012 |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: No - I do not plan to move or update the appliances |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Lighting: No - I do not plan to update the lighting |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Comment: Do you have any tearouts / used cabinets that your willing to sell. |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Land O Lakes, FL |
| Date: 04/23/2012 |
| Project Description: Build a new sunroom or enclosed patio or porch |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: I would like to add a sun room/patio onto the back of our house. We are looking in to prices. |
|
|
|
| Project Name: Build an Addition |
| Project Location: Land O Lakes, FL |
| Date: 04/09/2012 |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Project Description: Build - Use existing architectural drawings |
| Comment: i need an est on pergalow or outdoor room addition to home |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Land O Lakes, FL |
| Date: 04/05/2012 |
| Consumer Owns Home: Yes |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
|