|
|
| Project Name: Remodel a Bathroom |
| Project Location: Kennebunk, ME |
| Date: 05/15/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Remove shower plastic tub put in tiled with seat and glass door |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Kennebunk, ME |
| Date: 05/04/2012 |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: No - I do not plan to move or update the cabinets |
| Appliances: No - I do not plan to move or update the appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Lighting: No - I do not plan to update the lighting |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Kennebunk, ME |
| Date: 03/26/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: estimate for bathroom remodelling. tub/shower has been ripped out, some tile has been removed. need new tub installation and vanity. have the new tile that needs to be laid. more work will be involved in the future |
|
|
|
| Project Name: Remodel or Renovate One or More Rooms |
| Project Location: Kennebunk, ME |
| Date: 03/26/2012 |
| Design Preparation: None |
| Rooms to be Remodeled: Bathroom |
| Rooms to be Remodeled: Bedroom |
| Expected Level of Quality: High End - I prefer the highest quality craftsmanship and materials |
| Remodel Featurings: Interior and/or Exterior Doors |
| Remodel Featurings: Other |
| Remodel Featurings: Plumbing |
| Remodel Featurings: Walls and/or Ceilings |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Hi, my husband and I would like to get an estimate on turning the living room and bathroom downstairs into a master suite. This involves walls, doors, windows, tiling and minor plumbing. We also have a bathroom project upstairs, which we would like to get done immediately. It only involves shoring up the bathtub area and installing drywall, both are already down to studs, waterproofing and tiling. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Kennebunk, ME |
| Date: 02/13/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Kennebunk, ME |
| Date: 01/28/2012 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Build an Addition |
| Project Location: Kennebunk, ME |
| Date: 04/02/2011 |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Build - Use existing architectural drawings |
| Property Owner: Yes |
| Comment: addition to a sturdy, well maintained mobile home in Sanford. About 10 x 12 or so, possibly bigger. |
|
|
|
| Project Name: Remodel or Renovate One or More Rooms |
| Project Location: Kennebunk, ME |
| Date: 01/20/2011 |
| Design Preparation: Sketches and/or basic idea of project |
| Rooms to be Remodeled: Family room |
| Expected Level of Quality: Don't Know |
| Remodel Featurings: Electrical |
| Remodel Featurings: Flooring and/or Carpet |
| Remodel Featurings: Walls and/or Ceilings |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Family room is a converted garage with drop ceiling. Would like to do cathedral ceiling with two beams, also replace flooring |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Kennebunk, ME |
| Date: 01/16/2011 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: change out the tub |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Kennebunk, ME |
| Date: 11/17/2010 |
| Design Preparation: Sketches of basic idea of project |
| Basement Features: Bathroom(s) |
| Basement Features: Game Room |
| Basement Area Description: Unfinished |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
|