

|
 |
 |
Keaau Addition & Remodeling Contractors
|
 |
Prescreened Addition & Remodeling Contractors - Keaau, HI (Hawaii)

Unscreened Additions & Remodeling Contractors - Keaau, HI
Related Projects for Additions & Remodeling in Keaau, HI
Narrow your search by choosing one of these specific Additions & Remodeling services.
|
|
Not Looking for Addition & Remodeling Contractors in Keaau, HI?
If you're looking for Addition & Remodeling Contractors that serve a different city in Hawaii, here are some popular suggestions:

Find additional Hawaii Addition & Remodeling Contractors
|
|
Recent Job Requests for Addition & Remodeling Contractors in Keaau, Hawaii
|
| Project Name: Build an Addition |
| Project Location: Keaau, HI |
| Date: 05/25/2012 |
| Comment: I need est.for building a shed 16x24 19ft high & barnstyle roof wanted: 3 total. |
|
|
|
| Project Name: Build an Addition |
| Project Location: Keaau, HI |
| Date: 04/23/2012 |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Remodel existing space |
| Project Description: Design and build |
| Comment: Enclose part of existing lanai to make a walk in closet for master bedroom. Will need to remove 1 set of sliding doors coming off the living room area. |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Keaau, HI |
| Date: 04/19/2012 |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: update my kitchen |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Keaau, HI |
| Date: 03/30/2012 |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Lighting: No - I do not plan to update the lighting |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Replace counter tops, cabinets, dishwasher, stove, oven. Counter top to be granite or similar solid material. Stove and oven to be one piece, microwave oven built into exhaust. |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Keaau, HI |
| Date: 01/10/2012 |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Project Description: Major home repair project |
| Project Type: Both |
| Property Owner: Yes |
| Comment: On Water Damage bid form: Mold remediation 1) Address and repair the source of the water intrusion (several areas there appears to be mold) 2) Demo and/ or treatment of affected material 3) 3rd party post-remediation AIR clearance test 4) Letter stating that the test results have passed On Itemized bid form: Build back of all demo’d and remediated areas from the mold/water damage will be needed. For example: Installation of new materials of like kind and quality as those removed during remediation. Windows need replaced, flooring, and subflooring, electrical, plumbing, appliances Any needed cosmetic repairs All other repairs necessary to ensure the safety, preservation & marketability of this property |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Keaau, HI |
| Date: 01/10/2012 |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Project Description: Major home repair project |
| Project Type: Both |
| Property Owner: Yes |
| Comment: On Water Damage bid form: Mold remediation 1) Address and repair the source of the water intrusion (several areas there appears to be mold) 2) Demo and/ or treatment of affected material 3) 3rd party post-remediation AIR clearance test 4) Letter stating that the test results have passed On Itemized bid form: Build back of all demo’d and remediated areas from the mold/water damage will be needed. For example: Installation of new materials of like kind and quality as those removed during remediation. Windows need replaced, flooring, and subflooring, electrical, plumbing, appliances Any needed cosmetic repairs All other repairs necessary to ensure the safety, preservation & marketability of this property |
|
|
|
| Project Name: Build an Addition |
| Project Location: Keaau, HI |
| Date: 10/07/2011 |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Bathroom |
| Property Owner: Yes |
| Comment: Remodel and replace and existing bathroom, which is an extension of a house. The walls need replacing and perhaps the roof. Cement floor, and tub are only components that should remain in rennovation. This bathroom is of the 'lean to' type off one side of the house. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Keaau, HI |
| Date: 04/23/2011 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Comment: Small bathroom, primarily shower replacement, some drywall work. |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Keaau, HI |
| Date: 02/10/2011 |
| Consumer Owns Home: Yes |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Estimate - kitchen and bathroom new cabinrty new shoes bathroom cabinets, kitchen is 16 by 14 in size. master bath is 8 by 12, flooring lighting, 2nd bathroom is 8 by 8 |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Keaau, HI |
| Date: 12/06/2010 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 9 - 12 weeks |
|
|
ServiceMagic Pros Are...

|