|
|
| Project Name: Remodel a Bathroom |
| Project Location: Irmo, SC |
| Date: 05/16/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: This is a half bath on a slab foundation. We would like to add a shower to make it a full bath and extend into another room for a bedroom and full bath. The wall between the bedroom and bathroom has pipes for water and draining. We would prefer to not bust up the slab to run the piping but tap into the wall between the bathroom and bedroom since the bathroom would have to be extended into the bedroom anyway. |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Irmo, SC |
| Date: 05/04/2012 |
| Project Description: Enclose existing patio or porch with roof, walls or windows |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Comment: Enclose deck for all season |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Irmo, SC |
| Date: 04/13/2012 |
| Shower / Bath: No - I will keep the existing shower or bath as is |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: Yes |
| Property Owner: Yes |
| Comment: replace defective shower pan |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Irmo, SC |
| Date: 04/12/2012 |
| Type of Work: Carpentry-finish |
| Type of Work: Doors and windows |
| Type of Work: Flooring |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Project Description: Major home repair project |
| Project Type: Both |
| Property Owner: Yes |
| Comment: I have an exterior door that has water damage - one of the deck boards below the door needs to be replaced and hte water damage has damaged flooring inside the house. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Irmo, SC |
| Date: 04/12/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: No |
| Comment: I would like to add seating in my existing shower with new shower doors and glass |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Irmo, SC |
| Date: 04/05/2012 |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: No - I do not plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Irmo, SC |
| Date: 03/27/2012 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Lighting: No - I do not plan to update the lighting |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Irmo, SC |
| Date: 03/25/2012 |
| Project Description: Enclose existing patio or porch with roof, walls or windows |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Fla. Room. Enclose existing screened in porch with existing roof. |
|
|
|
| Project Name: Build an Addition |
| Project Location: Irmo, SC |
| Date: 03/24/2012 |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Remodel existing space |
| Project Description: Design and build |
| Comment: What to build/add half bathroom downstairs with hallway leading from the den in the basement in the garage. We have a 2 car extended workshop garage. Den and Workshop is wall to wall. Will like to build a half bathroom ~5x5 in Garage (workshop area) with entrance from the den. Small hallway leading to bathroom from den (for a little privacy) House is split level, city sewer (may need an outside sewer pump?) and on a slab(no crawl space) The Daniels |
|
|
|
| Project Name: Remodel a Garage |
| Project Location: Irmo, SC |
| Date: 03/22/2012 |
| Scope of Remodel: Completely remodel garage |
| Storage cabinets / shelving: No - I do not plan to add or update the cabinets / shelving |
| Insulation: Yes - I plan to add insulation |
| Flooring: Yes - I plan to update the flooring |
| Electrical: Yes - I plan to update the lighting or electrical fixtures |
| Interior walls or drywall: Yes - I plan to add or remove walls or drywall |
| What kind of location is this?: Home/Residence |
| Garage doors: No - I do not plan to update the garage doors |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Want to convert garage into living space. Some sheet rock already up, needs some more, want to close up the windows. Probably some brick work and add a door. |
|