|
|
| Project Name: Remodel a Bathroom |
| Project Location: Inola, OK |
| Date: 05/15/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Stall shower back tile wall is leaking through the drywall on to next room wall and floor. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Inola, OK |
| Date: 02/25/2012 |
| Shower / Bath: No - I will keep the existing shower or bath as is |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Inola, OK |
| Date: 12/03/2011 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: No - I do not plan to move or update the appliances |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Lighting: No - I do not plan to update the lighting |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Inola, OK |
| Date: 07/31/2011 |
| Project Description: Build a new sunroom or enclosed patio or porch |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: add a sunroom |
|
|
|
| Project Name: Build an Addition |
| Project Location: Inola, OK |
| Date: 04/19/2011 |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Deck/Porch |
| Rooms Included:: Kitchen |
| Rooms Included:: Living/Family room |
| Property Owner: Yes |
| Comment: My kitchen and living room are two small. We would like to look at an option to expand to the north and to the south including a patio/outdoor kitchen option. I would also like to get plans on changing the upstairs into a Mather-In-Law suite. |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Inola, OK |
| Date: 04/04/2011 |
| Type of Work: Drywall |
| Type of Work: Flooring |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Project Description: Major home repair project |
| Project Type: Interior |
| Property Owner: Yes |
| Comment: I have had water damage to my home. The affected areas include living room,kitchen,hallway, three bedrooms, two bathrooms, and several closets. I spoke to Gabe the other day and was un-able to get back to him. Please let him know I am still interested but will not be able to meet up with him until Tuesday during the day. If this is satisfactory please call me at xxxxxxxxxxxx or xxxxxxxxxxxx. Thank you, <br />Linda Sowell |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Inola, OK |
| Date: 04/01/2011 |
| Type of Work: Drywall |
| Type of Work: Flooring |
| Type of Work: Tile |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Project Description: Major home repair project |
| Project Type: Interior |
| Property Owner: Yes |
| Comment: I am in search of a contractor to repair the walls, flooring, and tile covering approx. 1200 sq. ft. of my home. I am currently taking bids from licensed and bonded contractors that are willing to perform a free in home estimate. Please feel free to contact me by email at xxxxxxxxxxxxxxxxxxxxxx and we will arrange a time that will fit well with schedules. Thank you, Linda |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Inola, OK |
| Date: 03/05/2011 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Remodel or Renovate One or More Rooms |
| Project Location: Inola, OK |
| Date: 11/05/2010 |
| Rooms to be Remodeled: Bedroom |
| Rooms to be Remodeled: Laundry room |
| Rooms to be Remodeled: Other |
| Expected Level of Quality: Moderate - timing and/or price are more important to me |
| Remodel Featurings: Flooring and/or Carpet |
| Remodel Featurings: Walls and/or Ceilings |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: damage from leaking water heater. flooring and wall damage. |
|
|
|
| Project Name: Build an Addition |
| Project Location: Inola, OK |
| Date: 09/09/2010 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Addition: Remodel existing space |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Build - Use existing architectural drawings |
| Rooms Included:: Bedroom(s) |
| Property Owner: Yes |
| Comment: I want to add wall down our hallway that would create a third bedroom in our house. There is an open area in the front like an extra "living area" but I want to enclose it by adding a fourth wall to make a bedroom. |
|