|
| Project Name: Build an Addition |
| Project Location: Gretna, NE |
| Date: 05/23/2012 |
| Interested in Green Alternatives: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Second story addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Bathroom |
| Rooms Included:: Garage/Workshop |
| Property Owner: Yes |
| Comment: Would like to add an attached 2 car garage with a Master Bedroom second story. Would like approximate estimates. |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Gretna, NE |
| Date: 05/01/2012 |
| Design Preparation: None |
| Basement Features: Bathroom(s) |
| Basement Features: Storage |
| Basement Features: Game Room |
| Basement Area Description: Unfinished |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Gretna, NE |
| Date: 03/09/2012 |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Lighting: No - I do not plan to update the lighting |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: new stove refacing cabinets new counter tops new back splash and some new lighting |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Gretna, NE |
| Date: 03/04/2012 |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Gretna, NE |
| Date: 01/25/2012 |
| Design Preparation: Permits pulled |
| Basement Features: Bedroom(s) |
| Basement Area Description: Partially Finished |
| Square Footage: More than 800 (large) |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: The basement work was started by the previous owner, the HVAC and electrical is complete. It is a walk out so that wall is sheet rocked and most of the studs are done. I'm looking for sheetrock/mud & tape, texture, hanging doors and trim work to be completed. |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Gretna, NE |
| Date: 12/15/2011 |
| Project Description: Build a new sunroom or enclosed patio or porch |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Gretna, NE |
| Date: 10/20/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 months |
| Request Stage: Planning & Budgeting |
| Comment: The sunroom linking under my porch deck needs to be sprayed with a waterproofing agent between sunroom and porch deck. |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Gretna, NE |
| Date: 09/29/2011 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Gretna, NE |
| Date: 08/30/2011 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Build an Addition |
| Project Location: Gretna, NE |
| Date: 08/09/2011 |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Project Description: Design and build |
| Comment: extend 1 side of old farmhouse by 15 feet. will be 3 bedrooms, so no plumbing, we can do our own electrical & maybe interior finishing depending on the project cost |
|