|
|
| Project Name: Remodel a Kitchen |
| Project Location: Greenfield, IN |
| Date: 05/09/2012 |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: No - I do not plan to move or update the cabinets |
| Appliances: No - I do not plan to move or update the appliances |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Lighting: No - I do not plan to update the lighting |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Build an Addition |
| Project Location: Greenfield, IN |
| Date: 04/30/2012 |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Basement |
| Rooms Included:: Living/Family room |
| Rooms Included:: Office(s) |
| Property Owner: Yes |
| Comment: Want to add on to house app 600 sq feet with a basement under it current house is just a crawl space |
|
|
|
| Project Name: Build an Addition |
| Project Location: Greenfield, IN |
| Date: 04/29/2012 |
| Interested in Green Alternatives: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Living/Family room |
| Property Owner: Yes |
| Comment: adding room(s) on the back of our 1 story ranch approx 12 x 35 |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Greenfield, IN |
| Date: 03/20/2012 |
| Project Description: Enclose existing patio or porch with roof, walls or windows |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: HAVE EXISTING SREEN IN PORCH WANT TO ENCLOSE AND DOUBLE THE SIZE NOW 10X10 WANT 10 X 20 |
|
|
|
| Project Name: Build an Addition |
| Project Location: Greenfield, IN |
| Date: 03/12/2012 |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Detached addition |
| Project Description: Design and build |
| Comment: I want to add a basement for an existing house. I have enough room in the backyard. Should be able to enter the basement from existing home, but basement is not below the existing house,not to disturb the existing structure |
|
|
|
| Project Name: Build an Addition |
| Project Location: Greenfield, IN |
| Date: 02/27/2012 |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Bathroom |
| Rooms Included:: Bedroom(s) |
| Property Owner: Yes |
| Comment: Add 3 bedrooms and a half bath |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Greenfield, IN |
| Date: 01/19/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: THERE IS AN OPEN SPACE ON THE OTHER SIDE OF TUB THAT IN BUILDING WAS AN OPTION FOR A STAND UP SHOWER. tHAT OPTION WASN'T CHOSEN BY ORIGINAL OWNER OF HOUSE. wOULD LIKE TO MAKE A KNEE WALL BETWEEN AND MAKE AN ENLOSED SHOWER IN SPACE. pLUMBING IS IN ATTACHED WALL SINCE THE TUB/SHOWER IS THERE. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Greenfield, IN |
| Date: 01/12/2012 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Greenfield, IN |
| Date: 01/06/2012 |
| Basement Features: Bedroom(s) |
| Basement Area Description: Finished |
| Square Footage: More than 800 (large) |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Room in basements needs to be finished or a Possible redesign of basement to incorporate a bedroom if cost effective. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Greenfield, IN |
| Date: 12/19/2011 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
|