|
|
| Project Name: Build an Addition |
| Project Location: Gastonia, NC |
| Date: 05/07/2012 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Bathroom |
| Rooms Included:: Bedroom(s) |
| Property Owner: Yes |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Gastonia, NC |
| Date: 04/28/2012 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: No - I do not plan to move or update the appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: were happy |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Gastonia, NC |
| Date: 04/23/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: complete remodel of existing bathroom and laundry room, i have already removed all of the old bathroom fixtures |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Gastonia, NC |
| Date: 04/13/2012 |
| Project Description: Build a new sunroom or enclosed patio or porch |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Either add a patio or add a sunroom |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Gastonia, NC |
| Date: 04/10/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: I need an estimate for a moving a wall out in my bathroom and a new toilet installed. Trying to make the bathroom ADA compliant. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Gastonia, NC |
| Date: 04/10/2012 |
| Comment: Need an estimate on having their bathroom remodel. Need to move the wall, 16 inches or so. Main level of the house, need to install new doors, looking to remodel for disability access purpose. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Gastonia, NC |
| Date: 04/10/2012 |
| Comment: I need my bathroom widened for wheelchair access. One wall willl moved that presently has the bathtub on it. |
|
|
|
| Project Name: Build an Addition |
| Project Location: Gastonia, NC |
| Date: 03/29/2012 |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Bathroom |
| Rooms Included:: Bedroom(s) |
| Property Owner: Yes |
| Comment: addition of bedroom and handicapped accessible bath to home |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Gastonia, NC |
| Date: 03/28/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Comment: Replace existing shower/tub with new fiber glass shower/tub and new fixtures. |
|
|
|
| Project Name: Build an Addition |
| Project Location: Gastonia, NC |
| Date: 03/26/2012 |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Second story addition |
| Project Description: Build - Use existing architectural drawings |
|