|
| Project Name: Remodel a Kitchen |
| Project Location: Corvallis, OR |
| Date: 05/19/2012 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Corvallis, OR |
| Date: 05/15/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: In the process of buying first home would like the first project to be in the master bedroom upgrade partial into a full bathroom with shower. Maybe installing a bathroom outside also. |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Corvallis, OR |
| Date: 05/02/2012 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Corvallis, OR |
| Date: 04/18/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: remove old bathtub and install new bathtub |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Corvallis, OR |
| Date: 04/16/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: tub and shower need replacing floor as well. we may have dry rot behind tub and under floor around the tub area. |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Corvallis, OR |
| Date: 04/01/2012 |
| Consumer Owns Home: Yes |
| Project Description: Build a new sunroom or enclosed patio or porch |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: need to have a patio enclosure installed....200 sq ft |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Corvallis, OR |
| Date: 03/27/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Need to replace shower in master bath room. Some damage to floor. ? leaking shower |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Corvallis, OR |
| Date: 03/24/2012 |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: 1952 ranch style home next to a major university. Huge old kitchen with fireplace, tiny ceiling lights, lots of cupboards, counters, movable center island on wheels. Need vented fan over stove and old one in ceiling out, new ceiling, new lights both ceiling and over counters, resurfaced cupboards or new ones (which ever is less expensive, new floors. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Corvallis, OR |
| Date: 03/12/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Remove bidet. Enlarge shower and replace tiling. |
|
|
|
| Project Name: Build an Addition |
| Project Location: Corvallis, OR |
| Date: 03/11/2012 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Build - Use existing architectural drawings |
| Rooms Included:: Bedroom(s) |
| Property Owner: Yes |
| Comment: A 10 by 10 bedroom |
|