|
|
| Project Name: Remodel a Bathroom |
| Project Location: Columbia Falls, MT |
| Date: 04/28/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Replace tub with jetted corner tub, enlarge current room add separate shower, new floor new sinktop and vanity with new lighting. No curly cue bulbs cause extreme headaches please. Toilet will probably need to be relocated depends on layout, would like power flush. |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Columbia Falls, MT |
| Date: 04/03/2012 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 9 - 12 weeks |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Columbia Falls, MT |
| Date: 02/27/2012 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 9 - 12 weeks |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Columbia Falls, MT |
| Date: 10/07/2011 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: No - I do not plan to move or update the appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Lighting: No - I do not plan to update the lighting |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Columbia Falls, MT |
| Date: 09/17/2011 |
| Basement Features: Bathroom(s) |
| Basement Features: Bedroom(s) |
| Basement Features: Storage |
| Basement Features: Stairway |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Columbia Falls, MT |
| Date: 05/10/2011 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 7 - 8 weeks |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Columbia Falls, MT |
| Date: 03/20/2011 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Replace plastic tub shower surround with a tiled shower. New higher cabinets and additional cabinets over the toilet. New low flow toilet. Under tile floor heat. New light fixtures. Granite countertop. resurface wall texture and paint. New exhaust fan. |
|
|
|
| Project Name: Remodel a Garage |
| Project Location: Columbia Falls, MT |
| Date: 01/14/2011 |
| Scope of Remodel: Completely remodel garage |
| Storage cabinets / shelving: Yes - I plan to add or update the cabinets / shelving |
| Insulation: Yes - I plan to add insulation |
| Flooring: Yes - I plan to update the flooring |
| Electrical: Yes - I plan to update the lighting or electrical fixtures |
| Interior walls or drywall: Yes - I plan to add or remove walls or drywall |
| What kind of location is this?: Home/Residence |
| Garage doors: Yes - I plan to update the garage doors |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: looking to remodel a garage turn into living space. with storage and cabinets and a wall to hide storage space. Insulation, drywall, etc.. |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Columbia Falls, MT |
| Date: 12/20/2010 |
| Design Preparation: Sketches of basic idea of project |
| Basement Features: Bathroom(s) |
| Basement Features: Bedroom(s) |
| Basement Features: Laundry |
| Basement Area Description: Partially Finished |
| Square Footage: More than 800 (large) |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: No |
| Comment: Looking to purchase residence and Need to obtain quotes to finish basement including bathroom, install kitchen Cabinets, finish trim, repair flooring, and misc other items. |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Columbia Falls, MT |
| Date: 10/26/2010 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|