|
| Project Name: Remodel a Bathroom |
| Project Location: Choctaw, OK |
| Date: 05/21/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: complete remodel in bathroom. replace bath area. floor needs repair. replace sink and cabinets |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Choctaw, OK |
| Date: 04/27/2012 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Choctaw, OK |
| Date: 04/10/2012 |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
|
|
|
| Project Name: Build an Addition |
| Project Location: Choctaw, OK |
| Date: 04/04/2012 |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Remodel existing space |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Living/Family room |
| Property Owner: Yes |
| Comment: Looking at either room addition for study. Or bonus room within existing structure. (attic room) |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Choctaw, OK |
| Date: 03/13/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Replace bath tub with shower Possible replace cabinet tops and toilet Walls, floors and cabinets to remain unchanged |
|
|
|
| Project Name: Build an Outdoor Kitchen |
| Project Location: Choctaw, OK |
| Date: 03/12/2012 |
| Existing Patio: Yes |
| Flooring Selection: Standard |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 months |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Currently have 5 year old pool by Blue Haven (they will not be participating in bidding). Need to do upgrades and repairs of pool, add hot tub (in ground), add grand stone fireplace, improve outdoor flooring (some bad concrete...looking at options/upgrades), extend patio overhang. Plus minor things like moving sprinkler heads (solution needed possibly in placement). Looking for company with experience doing all these things and can guarantee quality of finished product. To be honest, I had an extremely bad experience with Blue Haven; and refuse to go down that path again. |
|
|
|
| Project Name: Build an Addition |
| Project Location: Choctaw, OK |
| Date: 02/29/2012 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Bathroom |
| Rooms Included:: Bedroom(s) |
| Property Owner: Yes |
| Comment: Master bedroom and bathroom |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Choctaw, OK |
| Date: 02/17/2012 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Build an Addition |
| Project Location: Choctaw, OK |
| Date: 01/18/2012 |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Second story addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Build - Use existing architectural drawings |
| Rooms Included:: Garage/Workshop |
| Property Owner: Yes |
| Comment: I would like to add an additional bonus room using the existing attic space, if possible. If not feasible, my secondary option would be to build a oversized one car detached garage. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Choctaw, OK |
| Date: 01/11/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
|