|
| Project Name: Remodel a Bathroom |
| Project Location: Bradenton, FL |
| Date: 05/20/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: redo existing bathroom. Enlarge,put in walk in tiled shower, new vanity, new toilet, new flooring. Will have to take part of a closet for space. Pocket door for bathroom and closet. Will need new baseboards thru out condo. Other projects may be discussed at meeting. Must be licensed and insured. Would like work done ASAP if possible. |
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Bradenton, FL |
| Date: 05/19/2012 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Bradenton, FL |
| Date: 05/19/2012 |
| Project Description: Enclose existing patio or porch with roof, walls or windows |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: It is currently a screened porch We want to make part a sunroom and rebuild/rescreen another part. |
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Bradenton, FL |
| Date: 05/18/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: we had a prior water leak behind the wall in the shower. We now need to have the walls replaced and would like to perform updates while doing so. |
|
|
|
| Project Name: Install or Replace a Shower |
| Project Location: Bradenton, FL |
| Date: 05/17/2012 |
| Type of shower install: Free-standing shower |
| Plumbing fixtures: Yes - I plan to install new plumbing fixtures |
| Tile: Yes - I plan to install new tile |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Part of larger remodel: No |
| Property Owner: Yes |
| Comment: Easy bath job for a professional. Would like to turn it around in a week - 10 days. |
|
|
|
| Project Name: Build an Addition |
| Project Location: Bradenton, FL |
| Date: 05/17/2012 |
| Design Preparation: Sketches or basic idea |
| Rooms for Addition: Porch |
| Financing Requested: No |
| Desired Completion Date: 1 - 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
|
|
|
| Project Name: Build an Addition |
| Project Location: Bradenton, FL |
| Date: 05/14/2012 |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Living/Family room |
| Property Owner: Yes |
| Comment: We have an existing patio concrete slab only. Interested in an extra room addtion that would be insulated and not just screened. |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Bradenton, FL |
| Date: 05/12/2012 |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Bradenton, FL |
| Date: 05/10/2012 |
| Comment: Needs estimates to remodel bathroom. no floor plan change and take out tub and lighting. some plumbing. Has plans already. |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Bradenton, FL |
| Date: 05/10/2012 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: No - I do not plan to move or update the appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: i would like to update my kitchen and foors |
|