|
|
| Project Name: Remodel a Bathroom |
| Project Location: Bluffton, SC |
| Date: 05/16/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: remodel master bath. Have cabinetry to put in want tub removed and replaced with extended shower. New flooring and tile work |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Bluffton, SC |
| Date: 04/29/2012 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Bluffton, SC |
| Date: 04/22/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Window replacement, counter top, re-tiling on walls only and new shower basin with glass door. Room size including shower area is 10 x 5' window size is 5'6" x 3' 6" |
|
|
|
| Project Name: Build an Addition |
| Project Location: Bluffton, SC |
| Date: 04/19/2012 |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Project Description: Design and build |
| Property Owner: Yes |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Bluffton, SC |
| Date: 04/03/2012 |
| Project Description: Build a new sunroom or enclosed patio or porch |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Would like to add a carolina room on our property using existing patio. Room to be used year round |
|
|
|
| Project Name: Remodel a Garage |
| Project Location: Bluffton, SC |
| Date: 03/19/2012 |
| Scope of Remodel: Enlarge existing garage |
| Storage cabinets / shelving: No - I do not plan to add or update the cabinets / shelving |
| Insulation: No - I do not plan to add insulation |
| Flooring: Yes - I plan to update the flooring |
| Electrical: No - I do not plan to update the lighting or electrical fixtures |
| Interior walls or drywall: Yes - I plan to add or remove walls or drywall |
| What kind of location is this?: Home/Residence |
| Garage doors: No - I do not plan to update the garage doors |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Comment: Closing off the golf cart entrance and building a housing for an indoor, above ground tornado shelter. |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Bluffton, SC |
| Date: 03/19/2012 |
| Type of Work: Framing |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Project Description: Major home repair project |
| Project Type: Both |
| Property Owner: Yes |
| Comment: We had attic stairs installed. The person who installed cut a portion of a truss and we want to have it repaired by a licensed framer. Our home warranty was invalidated because of what he did and we need to make the repairs so that the warrant will be in effect. Thank You. |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Bluffton, SC |
| Date: 02/29/2012 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: No - I do not plan to move or update the appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Lighting: No - I do not plan to update the lighting |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: we are on a very tight budget of about $5,000. we just bought our first home and would like to alter the kitchen cabinets and counters/add a square island with seating suitable to our needs within the kitchen space provided we plan to update the appliances at a later date. |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Bluffton, SC |
| Date: 02/17/2012 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Bluffton, SC |
| Date: 02/17/2012 |
| Shower / Bath: No - I will keep the existing shower or bath as is |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Desired Completion Date: More than 2 months |
| Request Stage: Ready to Hire |
| Comment: I currently have a shower and a separate tub area, would like tub taken out and made one big shower area, there is also a wall in between the two that would have to be removed. |
|