|
|
| Project Name: Build an Addition |
| Project Location: Blanchester, OH |
| Date: 05/01/2012 |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Project Description: Design and build |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Blanchester, OH |
| Date: 04/30/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: The house was built in the 40's and the bath is orignal and want to livin it up spa type tub and just a comlete rebuild |
|
|
|
| Project Name: Build an Addition |
| Project Location: Blanchester, OH |
| Date: 04/03/2012 |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Addition: Second story addition |
| Project Description: Design and build |
| Comment: Open to suggestions. Thinking about adding two bedrooms above the garage onto the second floor. If that's not possible, a ground floor addition would be considered. Cost is a HUGE factor. We are just in the "planning possibilities" stage. Not ready to get started |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Blanchester, OH |
| Date: 02/27/2012 |
| Comment: I need restoration for small fire damage |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Blanchester, OH |
| Date: 10/16/2011 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: Yes |
| Property Owner: Yes |
| Comment: water damage to flooring from leak. would like to see estimate of moving shower accross room - plumbling already exist. would like to turn existing shower (very small) into linen closet. Also needs carpet laid in master bedroom (water damaged carpet). |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Blanchester, OH |
| Date: 09/17/2011 |
| Project Description: Enclose existing patio or porch with roof, walls or windows |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
|
|
|
| Project Name: Build an Addition |
| Project Location: Blanchester, OH |
| Date: 09/17/2011 |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Type of Addition: Remodel existing space |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Deck/Porch |
| Property Owner: Yes |
| Comment: I want to redo my back porch, make it a all season room |
|
|
|
| Project Name: Build an Addition |
| Project Location: Blanchester, OH |
| Date: 05/19/2011 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Remodel existing space |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Living/Family room |
| Property Owner: Yes |
| Comment: We would like to a storage room into one of our large rooms. |
|
|
|
| Project Name: Remodel or Renovate One or More Rooms |
| Project Location: Blanchester, OH |
| Date: 04/13/2011 |
| Design Preparation: None |
| Rooms to be Remodeled: Dining room |
| Rooms to be Remodeled: Family room |
| Rooms to be Remodeled: Living room |
| Rooms to be Remodeled: Office |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Comment: Need Ceilings in home recoated and finished. Needs current drywall on ceiling resecured then recoated and design put in the new topping. |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Blanchester, OH |
| Date: 02/03/2011 |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: No - I do not plan to move or update the cabinets |
| Appliances: No - I do not plan to move or update the appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: No - I do not plan to update the lighting |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Put up backsplash tile and Granite countertops |
|