|
| Project Name: Remodel a Bathroom |
| Project Location: Aiea, HI |
| Date: 05/24/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Comment: bathroom is half way done. All plumbing and shower pan installed. Need someone to do finish work. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Aiea, HI |
| Date: 05/10/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Need to up date bathroom to handycap status. Some of the basic floor needs to bee replaced. |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Aiea, HI |
| Date: 04/13/2012 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: I am looking to hire someone to come out and remodel the kitchen. This is a complete gut and remodel. I also need a wall removed to enlarge the space. Looking to get drawings and remodel completed. Please call for more details. |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Aiea, HI |
| Date: 04/13/2012 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: I am looking to hire someone to come out and remodel the kitchen. This is a complete gut and remodel. I also need a wall removed to enlarge the space. Looking to get drawings and remodel completed. Please call for more details. |
|
|
|
| Project Name: Remodel or Renovate One or More Rooms |
| Project Location: Aiea, HI |
| Date: 04/12/2012 |
| Design Preparation: Sketches and/or basic idea of project |
| Rooms to be Remodeled: Bedroom |
| Rooms to be Remodeled: Kitchen |
| Rooms to be Remodeled: Living room |
| Expected Level of Quality: Good - I want a balance between quality and price |
| Remodel Featurings: Cabinetry |
| Remodel Featurings: Countertops |
| Remodel Featurings: Flooring and/or Carpet |
| Remodel Featurings: Interior and/or Exterior Doors |
| Remodel Featurings: Walls and/or Ceilings |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Basic updates for an old townhome. Kitchen - everything needs to be taken out, all appliances replaced, and new cabinets & flooring. Living room - rid of popcorn ceiling Bedrooms - replace closet doors, all interior doors to be replaced Carpet upstairs to be replaced and downstairs replace carpet with laminate wood flooring. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Aiea, HI |
| Date: 04/03/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Aiea, HI |
| Date: 02/25/2012 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: No - I do not plan to move or update the appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Change and extend cabinet all solid wood, relocate lighting bigger stainless steel sink |
|
|
|
| Project Name: Remodel or Renovate One or More Rooms |
| Project Location: Aiea, HI |
| Date: 02/25/2012 |
| Design Preparation: None |
| Rooms to be Remodeled: Bedroom |
| Rooms to be Remodeled: Dining room |
| Expected Level of Quality: Moderate - timing and/or price are more important to me |
| Remodel Featurings: Electrical |
| Remodel Featurings: Interior and/or Exterior Doors |
| Remodel Featurings: Roofing |
| Remodel Featurings: Walls and/or Ceilings |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Second floor balcony, Dining room enlargement and additional bedroom. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Aiea, HI |
| Date: 02/23/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: replace countertop and retile shower in guest bathroom. Convert bathtub to walk-in shower, re-tile shower and floor and replace countertop in master bath |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Aiea, HI |
| Date: 02/16/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Update/remodel a small bathroom. Replace the tub with a walkin showe with low stepover. Maybe using seamless moulded replacement of cultured marble or Corian with a built in bench. Relpace vanity and basin with ready-made from places like Home Depot and new faucet. REplace mirror with combination storave and mirror unit. patch drywall as needed. New tile flooring to replace old existing vinyl tile. |
|